Skip to content
Set your address, change address
Demolition of wall

Demolition of wall

Construction

About this service

Wall Demolition Works in Construction

Professional wall demolition services for residential, commercial, villa, office, retail, and other properties. Our wall demolition services provide complete solutions for the safe removal of existing walls, partitions, block walls, brick walls, gypsum walls, and other non-structural wall elements based on the existing site condition, approved drawings, site requirements, measurements, accessibility, and customer specifications.

Services Include

Wall Demolition Site Inspection & Assessment

Complete Wall Demolition Works

Internal & External Wall Demolition

Block Wall Demolition

Brick Wall Demolition

Concrete Block Wall Removal

Gypsum Board & Partition Wall Removal

Lightweight Partition Demolition

Boundary Wall Demolition

Partial Wall Removal

Complete Wall Removal

Door & Window Opening Enlargement

Removal of Existing Wall Finishes

Removal of Plaster, Tiles & Cladding Where Required

Manual & Mechanical Demolition

Controlled Demolition Works

Breaking & Removal of Wall Materials

Debris Collection & Removal

Loading & Transportation of Demolition Waste

Protection of Existing Floors, Fixtures & Surrounding Areas

Isolation of Electrical & Plumbing Services Where Required

Site Cleaning After Demolition

Final Inspection & Site Handover

Special Notes

The above-mentioned price of AED 12 is sqm price applicable for the inspection only.

All required demolition tools, equipment, transportation, waste disposal, protective materials, scaffolding, machinery, and other related materials are not included unless specifically mentioned in the quotation.

Before demolition, the wall will be assessed to determine whether it is structural or non-structural. Structural walls, columns, beams, load-bearing elements, or any other structural components will require proper engineering assessment and approval before removal.

Any structural demolition, major concrete cutting, temporary structural support, shoring, reinforcement modification, or engineering works will be quoted separately.

Any electrical cables, water pipes, drainage pipes, gas lines, HVAC services, fire-fighting systems, or other concealed services located within or behind the wall must be identified and isolated before demolition. Related MEP works will be charged separately where applicable.

Any authority approvals, permits, engineering drawings, structural calculations, inspections, or certifications required for the demolition works will be charged separately.

The demolition works will be assessed based on the actual wall condition, wall type, thickness, height, total area, accessibility, working location, presence of concealed services, required equipment, and disposal requirements.

Any additional works or unforeseen site conditions identified during the inspection will be quoted separately.

Additional charges may apply depending on the actual site condition, wall construction, demolition method, working height, accessibility, quantity of debris, disposal requirements, and specific project requirements.

The final price will be confirmed after site inspection, measurements, assessment of the wall and surrounding areas, determination of the demolition method, and confirmation of the required scope of work.

All demolition works will be carried out using suitable methods and standard construction safety, protection, demolition, debris removal, and site-cleaning practices applicable to the project requirements.

Reviews

No reviews yet. Only customers with a finished job can leave one, so every review here is real.

Often booked with this